• The IF26 SME Call is a new EU Innovation Fund strand with around €200 million for SME-led projects with CAPEX between €2.5 million and €20 million.
• The process is simpler than other Innovation Fund calls: fewer documents, a semi-automated greenhouse gas avoidance tool, lighter reporting, and no previous EU grant experience required.
• There are two application rounds: the first deadline is expected at the end of March 2027 and the second at the end of September 2027. Both dates are indicative until the call text is published.
• Solar thermal, including solar heat for industrial processes, is eligible. As a standalone system or combined with heat pumps, heat recovery and thermal storage, it gives SMEs a route to lower, more predictable heat costs with part of the capital covered by grant.
Estimated read time: 7 to 8 minutes
What is the IF26 SME Call and who can apply?
The IF26 SME Call is a new EU Innovation Fund call with a planned budget of €200 million for small-scale decarbonisation projects led by SMEs. Projects must have capital expenditure between €2.5 million and €20 million, and every consortium member must meet the EU SME definition. The call text is expected on 3 December 2026.
An SME, under EU Recommendation 2003/361, is a business with fewer than 250 staff and either turnover of up to €50 million or a balance sheet of up to €43 million. Larger companies with projects in the same size range are not excluded from the Innovation Fund; they can apply for alternative funds with different qualification parameters.
The SME Call is one of five IF26 calls and auctions expected to open in December 2026. For larger industrial heat projects, our IF26 Heat Auction blog covers this route. This article is about the on-ramp for smaller SME operators, and what it takes for an industrial solar heat project to clear it.
The challenge: why smaller industrial heat projects have missed out on EU funding
SMEs have not been short of eligible projects. They have been short of the time, technology market, documentation capacity and grant experience that Innovation Fund applications have demanded. Earlier small-scale Innovation Fund topics awarded just €30 million in IF23 and €47 million in IF24, a fraction of the programme’s total.
The pattern is not limited to smaller firms. The IF25 Heat Auction pilot received 85 bids and requested only around €397 million against a €1 billion budget. According to the European Commission, application complexity and short preparation windows held participation back, not a lack of demand. The IF26 SME Call is the Commission’s response for smaller operators: a simpler process, two rounds, and an explicit appetite for projects that carry more risk.
The cost of staying on gas is rising
EU ETS2 extends carbon pricing to fuels used for heating in buildings and smaller industry from 1 January 2028, following a one-year postponement adopted in 2026. For SMEs that sit outside the existing EU ETS, this is the first time a Europe-wide carbon price will be built into every unit of natural gas burned on site. Our analysis of how ETS2 impacts the cost of industrial heat in Spain shows what that looks like in practice.
Electrification alone carries grid risk
The obvious alternative to gas is electrified heat, and industrial heat pumps are an important part of the toolkit. But they add load to grids that are already constrained. Grid connection delays across Europe are blocking decarbonisation plans, with hundreds of gigawatts of capacity sitting in connection queues and some regions unable to guarantee new industrial connections until the mid-2030s.
The Spain blackout of 28 April 2025 showed the industrial impact when the grid fails. Around 60% of Spain’s generation was lost within five seconds, production lines stopped, and estimates of total economic damage ranged from €2.2 billion to €4.5 billion. We cover the full picture in Grid Reliance as an Industrial Risk.
Solar thermal energy security comes from generating heat on site, without electricity as an intermediate step. When paired with a heat pump, it also reduces industrial heat pump grid capacity requirements by lowering the temperature lift the heat pump has to deliver.
Capital is still the constraint
Solar thermal carries a higher upfront cost than a gas boiler, and a lower, more predictable running cost over its lifetime. The gap between those two positions is exactly what grant funding is designed to close. For SMEs, it has rarely been accessible until now.
IF26 SME Call at a glance: budget, eligibility and key dates
Larger companies cannot apply through this call and should look at the IF26 heat auction instead. Not ready for round one? Round two is a genuine second chance, not an afterthought.
SME Call or Heat Auction: which IF26 call fits your heat project?
Operators with larger sites and multi-megawatt heat loads should read our IF26 Heat Auction guide before choosing a route.
How the €2.5 million threshold enables solar thermal projects
The IF26 SME Call lowers the barrier to applying, but it does not lower the €2.5 million CAPEX floor. Whether a solar thermal industrial heat project clears it comes down to system design: scale, the right combination of technologies, and an accurate match between collector output and process temperature.
Naked Energy is a renewable heating technology and solutions provider. Our System Design team models the site’s thermal load, sizes the array and integrates it with the rest of the heat system. In our experience, eligible SME projects typically fall into one of four archetypes, or combine elements of several.
1. Large single-site array. Sites with substantial, continuous process heat demand, such as breweries, dairies and food and beverage plants, can reach the CAPEX floor with solar thermal alone. VirtuHOT delivers process heat up to 120°C, and its high energy density means more heat per square metre of available roof or ground space.
2. Solar thermal and heat pump cascade. Solar thermal pre-heats the heat pump inlet, reducing the temperature lift and the electrical load. Cascade systems can reach steam temperatures of up to 185°C. See our guide to solar thermal and heat pump hybrid systems.
3. Solar thermal with thermal storage. Storage shifts generation to when heat is needed, raises the solar fraction and increases the project scope. Water-based thermal storage costs a fraction of battery storage per kilowatt hour.
4. Integrated systems with PV and waste heat recovery. A whole-site thermal and electrical strategy, combining VirtuHOT, on-site PV and recovered heat.
Read more on our Hybrid Systems guide.
Matching the temperature to the process
VirtuHOT process heat covers the 80°C to 120°C band directly, which includes pasteurisation, cleaning-in-place, pre-heating and washing. At these temperatures, heat can go straight into the process without an additional stage. For a breakdown by sector, see our Solar Thermal Operating Temperatures guide.
Making the innovation case honestly
The Innovation Fund supports innovative technologies, and the SME Call scores the degree of innovation against the European or national state of the art. A standard solar thermal installation should not assume it qualifies on that basis. Strong applications explain what is new about the integrated system: the technology combination, the control strategy, the storage design, or the process it decarbonises.
What the numbers look like
Two Naked Energy concept studies show where real projects sit against the €2.5 million to €20 million window. Both are concept studies based on stated site assumptions, not completed installations.
The brewery clears the threshold with solar thermal alone. The hotel would need to be more than five times larger, or combined with heat pumps, storage or a wider site strategy, to qualify. Most SME projects will sit somewhere between the two, which is why design comes before the application, not after it.
How to prepare: a readiness checklist for SME applicants
1. Confirm SME status early. The EU definition looks at staff numbers, turnover and balance sheet, and takes linked and partner enterprises and investor shareholdings into account. Every consortium member must qualify and complete the online SME self-assessment.
2. Scope CAPEX against the €2.5m to €20m window. Decide whether the project needs scaling up or combining with heat pumps, storage or heat recovery to reach the floor.
3. Audit the thermal load. Map heat demand by temperature and time of day, so the solar fraction and storage are sized against real process needs. Our operating temperatures guide is a useful starting point.
4. Build the greenhouse gas avoidance case using the Commission’s semi-automated tool once it is published. Cost efficiency, the grant requested against emissions avoided, is one of the award criteria.
5. Plan funding for the share the grant does not cover. Equity, debt or third-party finance such as Heat-as-a-Service.
6. Choose a round. Round one, with a deadline expected at the end of March 2027, needs feasibility and permitting work to start in December. Round two, expected to close at the end of September 2027, allows more preparation time.
7. Prepare feasibility, permitting and supporting documents, and register in the EU Funding and Tenders Portal’s Participant Register well before the deadline.
8. Engage a technology partner early for site assessment, yield modelling and system design. See our System Design solution.
A suggested timeline for round one: December, SME status check, scoping and a Commission orientation dialogue; January, system design and yield modelling; February, GHG calculation and financial plan; March, submission and our teams at Naked Energy will assist you in every step of the way.
Where Heat-as-a-Service fits
Heat-as-a-Service (HaaS) is not a replacement for grant funding. Itworks alongside it, or as a standalone zero-CAPEX route for sites that choosenot to apply. Under HaaS, a third party finances, owns and operates the system,and the customer pays only for the heat delivered.
The all-SME consortium rule means HaaS structures need careful planning. If a third-party financier is not itself an SME, it cannot join the consortium, so the structure must be agreed early: for example, the financier acting as a heat supplier outside the consortium. Confirm the permitted structure against the published call text before committing. Find out more about our Heat-as-a-Service model.
Conclusion
For the first time, SMEs have a dedicated Innovation Fund route sized for their projects, with around €200 million available, a simpler process and two chances to apply. ETS2 carbon pricing from 2028 and growing grid constraints make the case for on-site industrial solar heat stronger every year.
What the call does not change is the €2.5 million CAPEX floor. The projects that succeed will be the ones designed to clear it: the right scale, the right technology combination and an accurate temperature match to the process.
The IF26 SME Call lowers the barrier to applying. The scale and design of the project still decide whether it clears it.
To discuss a design and suitability assessment before round one scoping closes, visit our System Design solution page or contact the Naked Energy team at commercial@nakedenergy.com.
Frequently Asked Questions
What is the IF26 SME Call?
The IF26 SME Call is a new EU InnovationFund call with a planned budget of around €200 million for small-scale decarbonisation projects led by SMEs. Eligible projects have capital expenditure between €2.5 million and €20 million. The call is designed to be simpler than other Innovation Fund calls, with fewer documents and lighter reporting.
Who is eligible to apply?
SMEs as defined by EU Recommendation2003/361: fewer than 250 staff and either turnover up to €50 million or a balance sheet up to €43 million. Applicants can apply alone or as a consortium, but every consortium member must be an SME. Larger companies apply through the IF26 Net-Zero Technologies Call instead.
How much CAPEX must a project have?
Projects must have capital expenditure between €2.5 million and €20 million. Projects above €20 million, and projects in the same range led by larger companies, belong in the IF26 Net-Zero Technologies Call. Smaller solar thermal projects can reach the €2.5 million floor by scaling up or combining with heat pumps, storage or heat recovery.
Financing options such as HaaS are available as a zero CAPEX route.
Do we need previous EU grant experience?
No. The IF26 SME Call is designed for SMEs without previous EU grant experience. It uses fewer documents, a semi-automated tool for calculating greenhouse gas avoidance, and simpler reporting and monitoring. Applicants can also book a 25-minute online orientation dialogue with the European Commission and CINEA between December 2026 and February 2027.
When are the deadlines?
The first application deadline is expected at the end of March 2027, after the call text is published on 3 December 2026. A second round is expected to open in April 2027 and close at the end of September 2027. All dates are indicative until confirmed in the published call text.
Can a solar thermal project apply?
Yes. Solar thermal, including solar heat for industrial processes, is within the call’s scope. Projects are scored on innovation, greenhouse gas avoidance, maturity, replicability and cost efficiency, so applications should explain what is innovative about the system. Many projects will need scaling up or combining with heat pumps or storage to reach €2.5 million CAPEX.
How is the SME Call different from the IF26 Heat Auction?
The SME Call is for SME-led projects of €2.5 million to €20 million CAPEX, scored against award criteria through a simplified process. The IF26 Heat Auction offers up to €1 billion through competitive bids in €/tonne ofCO2 abated, for larger industrial heat projects with a minimum of 3 or 5 MWth.
What if we are not ready for the first round?
Apply in the second round. The IF26 SME Call has two application rounds, and the second is expected to open in April 2027 with a deadline at the end of September 2027. That gives more time for site assessment, system design, permitting and the greenhouse gas avoidance calculation.